Nughthoh, Arfawi Kurdhi and Yuliana, Yuliana and Bambang, Suratno (2021) Integrated production inventory routing planning for vendor-buyers coordination supply chain with probabilistic demand, unstable lead time, setup cost reduction, service level consideration. International Journal of Revenue Management (IJRM), 12 (3/4). pp. 258-280.
Text
Artikel Integrated Production.pdf Download (560kB) |
Abstract
This paper introduces a single-vendor multi-buyer system in a divergent supply chain associated with the inventory, production, and transportation or vehicle routing problem (VRP). The demand is distributed normally. The vendor is concerned with lowering setup costs through investments, while buyers are concerned with reducing lead time. Buyers’ lead time, except transportation time, can be shortened by adding crashing expense. The vendor produces goods and transports them to buyers in various locations using a fleet of vehicles with similar capability. The related VRP’s goal is to reduce the overall distance travelled by all vehicles. The aim of this study is to develop an integrated system considering production, inventory, and transportation; and to minimise the total expected cost by determining the optimal solution of lead time, order quantity, safety factor, routing decision and shipment frequency, which has been demonstrated numerically. The optimum output, inventory, and distribution for the vendor and buyers can be obtained by designing an integrated-inventory algorithm and employing the Clark-Wright algorithm. Keywords: integrated model; lead time; service level constraint; SLC; setup cost reduction; routing problem.
Item Type: | Article |
---|---|
Subjects: | Q Science > QA Mathematics |
Divisions: | Fakultas Keguruan dan Ilmu Pendidikan > Pend. Matematika |
Depositing User: | Unwidha Perpustakaan Unwidha |
Date Deposited: | 10 May 2022 05:22 |
Last Modified: | 10 May 2022 05:22 |
URI: | http://repository.unwidha.ac.id:880/id/eprint/2779 |
Actions (login required)
View Item |